Bibliothèque juridique et analyse de dossiers · Autriche · Belgique · Union européenne
LAWxPERT Connexion Compte gratuit

Cap. 392 · cap/392 (Cap. 392)

Cap. 392 Art. 48weapons of production of (a) (i) (ii) (iii) (b) shall (i) (ii) (c) 50. The seals on days after be 51. During conduct 52. The inspect planned the 53. access to on the 54. The Article inspected preclude Verification of 55. The weapons destroyed each agreed 56. When all After promptly

PART XI: INVESTIGATIONS IN CASES OF ALLEGED

En vigueurTexte officiel

The purpose of the systematic verification of a chemical production facility shall be to ensure that any resumption Detailed on-site inspection procedures, which may include: Visual examinations; Checking and servicing of seals and other agreed devices; and Obtaining and analysing samples; Procedures for using tamper-indicating seals and other agreed equipment to prevent the undetected reactivation of the facility, which specify: The type, placement, and arrangements for installation; and The maintenance of such seals and equipment; and Other agreed measures. or other approved equipment provided for in a detailed agreement inspection measures for that facility shall be placed not later than 240 this Convention enters into force for a State Party. Inspectors shall permitted to visit each chemical weapons production facility for the installation of such seals or equipment. each calendar year, the Technical Secretariat shall be permitted to up to four inspections of each chemical weapons production facility. Director-General shall notify the inspected State Party of his decision to or visit a chemical weapons production facility 48 hours before the arrival of the inspection team at the facility for systematic inspections or visits. In the case of inspections or visits to resolve urgent problems, this period may be shortened. The Director-General shall specify purpose of the inspection or visit. Inspectors shall, in accordance with the facility agreements, have unimpeded all parts of the chemical weapons production facilities. The items declared inventory to be inspected shall be chosen by the inspectors.

guidelines for determining the frequency of systematic on-site inspections shall be considered and approved by the Conference pursuant to VIII, paragraph 21 (i). The particular production facility to be shall be chosen by the Technical Secretariat in such a way as to the prediction of precisely when the facility is to be inspected.

destruction of chemical weapons production facilities purpose of systematic verification of the destruction of chemical production facilities shall be to confirm that the facility is in accordance with the obligations under this Convention and that item on the declared inventory is destroyed in accordance with the detailed plan for destruction. items on the declared inventory have been destroyed, the Technical Secretariat shall confirm the declaration of the State Party to that effect. this confirmation, the Technical Secretariat shall terminate the systematic verification of the chemical weapons production facility and shall remove all devices and monitoring instruments installed by the inspectors.