S.L. 545.20 · Liquefied Petroleum Gas Market (S.L. 545.20)
S.L. 545.20 Art. 15Design and construction of an authorised facility.
(1) Without prejudice to any other provisions of these regulations or any other law, all authorised facilities designed and constructed after the entry into force of these regulations have to be designed and constructed in accordance with standards and specifications prescribed by the Regulator and, or any other authority competent at law.
(2) Once the design and construction have been carried out, a competent person must submit in writing to the Regulator a certification that all standards and safety requirements imposed on the authorised facility have been abided by and including a signed declaration to the effect that such authorised facilities have been constructed by a competent LPG installer.
(3) No person other than a competent LPG installer, shall construct an authorised facility or a facility required to be so authorised or carry out any material alteration to an authorised facility under these regulations:
Provided that such competent LPG installer shall be supervised by a competent person in the construction of an authorised facility or a facility required to be so authorised under these regulations.
Änderungsgeschichte
- Amended by L.N. 175 of 2015