Rechtsbibliothek und Fallanalyse · Österreich · Belgien · Europäische Union
LAWxPERT Anmelden Kostenloses Konto

S.L. 549.50 · Waste Management (Management Of Waste (S.L. 549.50)

S.L. 549.50 Art. 7Wastemanagement plan. S.L. 423.20 S.L. 549.39

PART III

In KraftAmtlicher Text

(1) The operator shall draw up a waste management plan for the minimisation, treatment, recovery and disposal of extractive waste, taking account of the principle of sustainable development.

(2) The objectives of the waste management plan shall be:

(a) to prevent or reduce waste production and its harmfulness, in particular by considering:

(i) waste management in the design phase and in the choice of the method used for mineral extraction and treatment;

(ii) the changes that the extractive waste may undergo in relation to an increase in surface area and exposure to conditions above ground;

(iii) backfilling into the excavation void, whether created through surface or underground extraction, after extraction of the mineral, as far as is technically and economically feasible and environmentally sound in accordance with existing Community or Maltese environmental standards and with the requirements of these regulations where relevant;

(iv) putting topsoil back in place after the closure of the waste facility or, if this is not practically feasible, reusing topsoil elsewhere;

(v) using less dangerous substances for the treatment of mineral resources;

(b) to encourage the recovery of extractive waste by means of recycling, reusing or reclaiming such waste, where this is environmentally sound in accordance with existing Community or Maltese environmental standards and with the requirements of these regulations where relevant;

(c) to ensure short and long-term safe disposal of the extractive waste, in particular by considering, during the design phase, management during the operation and after-closure of a waste facility and by choosing a design which:

(i) requires minimal and, if possible, ultimately no monitoring, control and management of the closed waste facility;

(ii) prevents or at least minimises any long-term negative effects, for example attributable to migration of airborne or aquatic pollutants from the waste facility; and

(iii) ensures the long-term geotechnical stability of any dams or heaps rising above the pre-existing ground surface.

(3) The waste management plan shall contain at least the following elements:

(a) the proposed classification for the waste facility in accordance with the criteria laid down in regulation 6 and a document demonstrating that a major-accident prevention policy, a safety management system for implementing it and an internal emergency plan will be put into effect in accordance with regulation 8(3);

(b) waste characterisation in accordance with Schedule 2 and a statement of the estimated total quantities of extractive waste to be produced during the operational phase;

(c) a description of the operation generating such waste and of any subsequent treatment to which it is subject;

(d) a description of how the environment and human health may be adversely affected by the deposit of such waste and the preventive measures to be taken in order to minimise environmental impact during operation and after closure, including the aspects referred to in regulation 11(2)(a), (b), (d) and (e);

(e) the proposed control and monitoring procedures pursuant to regulation 11(2)(c);

(f) the proposed plan for closure, including rehabilitation, after-closure procedures and monitoring as provided for in regulation 12;

(g) measures for the prevention of water status deterioration in accordance with the Water Policy Framework Regulations, and for the prevention or minimisation of air and soil pollution pursuant to regulation 13;

(h) a survey of the condition of the land to be affected by the waste facility;

(i) any other relevant information requested by the competent authority.

(4) The waste management plan shall provide sufficient information to enable the competent authority to evaluate the operator’s ability to meet the objectives of the waste management plan as set out in sub-regulation (2) and his obligations under these regulations. The plan shall explain, in particular, how the option and method chosen as mentioned in sub-regulation (2)(a)(i) will fulfil the objectives of the waste management plan as laid down in sub-regulation (2)(a).

(5) The competent authority may specify the format in which such information is to be made available.

(6) The competent authority shall make this information available in accordance with the Freedom of Access to Information on the Environment Regulations.

(7) The waste management plan shall be reviewed every five years and or amended, as appropriate, in the event of substantial changes to the operation of the waste facility or to the waste deposited. Any amendments shall be notified to the competent authority.

(8) Plans produced pursuant to other Community or Maltese legislation and containing the information specified in sub-regulation (3) may be used where this obviates the unnecessary duplication of information and the repetition of work by the operator, on condition that all requirements under sub-regulations (1), (2), (3), (4) and (7) are met.

(9) The competent authority shall approve the waste management plan on the basis of procedures to be decided by the competent authority and shall monitor its implementation.