MT · S.L. 545.24
Electrical Installations Regulations (S.L. 545.24)
Содержание
- ст. 1 Citation. Scope. Overriding reasons relating to the public interest.
- ст. 2 Interpretation.
- ст. 3 Applicability.
- ст. 4 Compliance with standards and regulations.
- ст. 5 Requirement and classes of authorisations.
- ст. 6 Transitory provisions.
- ст. 7 Application procedure and conditions for authorisation.
- ст. 8 Renewal of authorisations.
- ст. 9 Authorisation B holders.
- ст. 10 Temporary provision of services.
- ст. 11 Suspension of an authorisation.
- ст. 12 Certification of installations.
- ст. 13 Condition and suitability of installation.
- ст. 14 Tests on completion of an electrical installation.
- ст. 15 Electrical installation rated at 300 Amps per phase or more.
- ст. 16 Periodic inspection.
- ст. 17 Temporary installation.
- ст. 18 Use of standby generators with fixed installations.
- ст. 19 Generators operating in parallel with the electricity distribution system.
- ст. 19A Energy storage facilities.
- ст. 20 Protective devices to be provided at thesupplypointfor installations not exceeding60Amps per phase.
- ст. 21 Protective devices to be provided at thesupplypointfor installations exceeding60Amps per phase.
- ст. 22 Earthing systems.
- ст. 22A Protection measures for electrical installations extensions. S.L. 545.41.
- ст. 23 Protective devices on motor loads. S.L. 545.51.
- ст. 24 Inspections.
- ст. 25 Identification card.
- ст. 26 Register of authorisations.