Rechtsbibliothek und Fallanalyse · Österreich · Belgien · Europäische Union
LAWxPERT Anmelden Kostenloses Konto

S.L. 549.172 · Environmental Permitting (Procedure For (S.L. 549.172)

S.L. 549.172 Art. 18Renewal of a permit.

PART III

In KraftAmtlicher Text

(1) A permit holder may apply for the renewal of the permit during its period of validity as may be specified in the permit conditions:

Provided that permits falling within the scope of Categories 1.13, 1.16 and 1.17 in the First Schedule shall not be renewed.

(2) The Authority may decide to grant, partially grant or refuse the renewal of a permit, and may also vary and, or modify any condition. The Authority may also request any further information or detail from the permit holder as may be required for the renewal process.

(3) The permit shall only be considered as renewed once the Authority issues the renewed permit. The processing of renewal applications shall follow the processing time periods stipulated in regulation 11.