S.L. 545.41 Art. 23Main fuses.

In KraftAmtlicher Text

(1) The main fuse shall be supplied and shall be placed in such position and location as may be determined by the distribution system operator.

(2) The main fuse box or busbar chamber shall be sealed by the distribution system operator. The distribution system operator shall be entitled to charge a fee as stipulated in Sixth Schedule if any fuse box is found upon inspection, to be damaged, tampered with or missing.

(3) The main fuse box or busbar chamber shall at all times remain the property of the distribution system operator.

(4) Where the customer requires the distribution system operator to effect repairs consisting only in the replacement of one (1) or more fuses, or where the fault is due to the customer’s internal electrical installation, a fee shall be charged in accordance with item 17 of the Sixth Schedule.

(5) Whenever access to the premises, for the removal of a main fuse is not possible either on account of the opposition of the customer, or on account of the premises being found closed on more than one (1) occasion, the distribution system operator may, after giving prior written notice by printed or electronic means to the customer, suspend the network connection by disconnecting the installation at the mains, whether overhead or underground. The distribution system operator shall be entitled to charge the customer for the costs of any work, including excavation works, carried out to enable the disconnection and removal of the main fuse.