Rechtsbibliothek und Fallanalyse · Österreich · Belgien · Europäische Union
LAWxPERT Anmelden Kostenloses Konto

S.L. 545.39 · Competitive Bidding Rules For (S.L. 545.39)

S.L. 545.39 Art. 14Connection of the approved renewable energy installations.     S.L. 545.01.

In KraftAmtlicher Text

(1) The successful bidder shall bear the costs of connection of the approved renewable energy installation to the nearest suitable point of connection of the distribution system.

(2) The costs for connection to the distribution system referred to in sub-regulation (1) shall be determined by the distribution system operator in accordance with the Electricity Supply Regulations.