S.L. 545.35 · Promotion Of Energy From Renewable (S.L. 545.35)
S.L. 545.35 Art. 20Simple-notification procedure for grid connections.
(1) The Regulator shall establish a simple-notification procedure for grid connections whereby installations or aggregated production units of renewables self-consumers and demonstration projects, with an electrical capacity of 10.8kW or less, or of a capacity which is equivalent thereto for connections other than three-phase connections, are to be connected to the grid following a notification to the distribution system operator.
(2) The distribution system operator may, within a limited period following the notification referred to in sub-regulation (1), reject the requested grid connection or propose an alternative grid connection point on justified grounds of safety concerns or technical incompatibility of the system components:
Provided that the installation or aggregated production unit may be connected in the case of a positive decision by the distribution system operator, or in the absence of a decision by the distribution system operator within one (1) month following the notification.
(3) The Regulator may allow a simple-notification procedure for installations or aggregated production units with an electrical capacity of above 10.8kW and up to 50kW, provided that grid stability, grid reliability and grid safety are maintained.