S.L. 545.32 Art. 14Connection of, and safety requirements for, renewable energy installations. S.L. 545.01.
The successful bidder shall bear the costs of connection of the approved renewable energy installation to the nearest suitable point of connection to the distribution system. The costs for connection to the distribution system shall be determined by the distribution system operator in accordance with the Electricity Supply Regulations.