MT · S.L. 545.1
* (S.L. 545.1)
Inhalt
- Art. 1 Title.
- Art. 2 Interpretation.
- Art. 3 Identification of officers.
- Art. 4 Applications.
- Art. 5 Furnished houses.
- Art. 6 Lessor bound in deemed to solidum be consumer.
- Art. 7 Houses occupied by more than one family.
- Art. 8 Deposits.
- Art. 9 Refund.
- Art. 10 Security.
- Art. 11 Letting of tenement or apartments for more than one quarter.
- Art. 12 Letting of tenement or apartments for less than one quarter.
- Art. 13 Applicability of regulations 11 and 12.
- Art. 14 Extension of services.
- Art. 15 Extension of electricity supplies which require a new substation or supplies at 11kv and above.
- Art. 16 Installations.
- Art. 17 Mainlinkeddouble or triple pole circuit breaker.
- Art. 18 Installations not carried out by the distribution system operator.
- Art. 19 Issue of licences.
- Art. 20 Condition and suitability of installation.
- Art. 21 Tests.
- Art. 22 Test results.
- Art. 23 Certification by electrical engineer.
- Art. 24 Examination of form.
- Art. 25 Certificates referred back.
- Art. 26 Suspension of supply until alterations are carried out.
- Art. 27 Installations to be rendered fit for connection.
- Art. 28 Fee for subsequent test.
- Art. 29 Alterations or additions.
- Art. 30 Alterations or additions which have not been reported.
- Art. 31 Refund of expenses.
- Art. 32 Supply of current to another tenement.
- Art. 33 Chairman may allow supply of current to another tenement.
- Art. 34 Payment by instalments for the cost of an installationandHT contribution.
- Art. 35 Installation to remain property of the distribution system operator.
- Art. 36 Tariffs for supply of electricity.
- Art. 37 EV meters.
- Art. 38 Tariff for supply of electricity to industrial premises.
- Art. 39 Temporary illuminations.
- Art. 40 Chairman to determine the type of premises.
- Art. 41 Electricity shore supplies.
- Art. 42 Special rates.
- Art. 43 Meter reading immediately prior to 1st October, 1974.
- Art. 44 Rate for reverse osmosis plants.
- Art. 45 Main fuse.
- Art. 46 Main fuse box shall be sealed.
- Art. 47 Main fuse box property of the distribution system operator.
- Art. 48 Meters.
- Art. 49 Unmetred supplies.
- Art. 50 Meters property of the distribution system operator.
- Art. 51 Meter to be fixed on consumer’s premises.
- Art. 52 Meters to be sealed.
- Art. 53 Replacement of meter.
- Art. 54 Opposition to removal of meter.
- Art. 55 Pre-payment meters.
- Art. 56 Introduction of articles other than coins in meter.
- Art. 57 Testing of meters.
- Art. 58 Result of test.
- Art. 59 Fee charged to consumer.
- Art. 60 Meters out of order.
- Art. 61 Reckoning of consumption of current.
- Art. 62 Special readings of meters.
- Art. 63 Fees charged in respect of special readings.
- Art. 64 Special readings taken on non- working days.
- Art. 65 Special readings rendered necessary by change in tenancy.
- Art. 66 Accounts.
- Art. 67 Non-payment of accounts.
- Art. 68 Where access to the premises is not possible.
- Art. 69 Delay of payment.
- Art. 70 Payment subsequently effected.
- Art. 71 Reconnection fee.
- Art. 72 Relief from liability.
- Art. 73 Discontinuance of supply.
- Art. 74 Generation of electricity under licence and fees in respect thereof.
- Art. 75 Licencetogenerate electricity.
- Art. 76 Regulations to be complied with.
- Art. 77 Electric motors.
- Art. 78 Motors rated at over 40 BHP.
- Art. 79 Motorsratedabove 1 1 / BHP. 2
- Art. 80 "Across-the-line" starting.
- Art. 81 Non-operation of regulations 77, 79 and 80.
- Art. 82 Apparatus inhibiting automatic restarting.
- Art. 83 Access to premises.
- Art. 83A Notification of appointments to install, etc., smart meters.
- Art. 84 Failure to afford facilities for reading of meters.
- Art. 85 Suspension of supply.
- Art. 86 Replacement of fuses.
- Art. 87 Restrictions on use of supply.
- Art. 88 Tampered meters, theft of electricity and unregistered consumption.